Detailed Product Description: | Central air conditioning condenser condenser automatic cleaning device online online auto cleaning industry About condenser is an important equipment central air conditioning units, power plants and industrial cooling systems, to improve the overall heat transfer performance of the condenser, the condenser to maintain a high heat transfer efficiency the smaller end of the poor and, spends a lot of manpower and financial resources, which shut down for long-term artificial chemical cleaning. After the Guangzhou Environmental Protection Technology Co. Marton absorption of foreign advanced technology similar products, has successfully developed ACTS condenser line automatic cleaning system, which controls the use of fluid mechanics and scientific logic, the cleaning ball directly into the condenser clean the condenser transducer heat pipe wall, so that long-term clean as new, so as to achieve the effect of energy-saving and environmental protection. At present, central air-conditioning condenser line automatic cleaning device mostly two pipeline design: a tube connected to the cold water supply shortcomings, a hot water outlet pipe connection is obvious that this second pipeline design has irreversible: 1, waterway short-circuit, reducing the rate of heat exchange condenser. Second pipeline design will result in cooling towers to 32 degrees water is introduced into the 27-degree water, thereby reducing the heat exchange efficiency of the condenser; 2, no windows to observe the ball, do not know the total number of plastic balls, and ultimately affect the cleaning effect; 3 Replace rubber ball is not convenient; 4, catching the ball is poorly designed, easy to lose the ball; 5, vertical pump design, rubber ball easily smashed impeller. For two piping design shortcomings, our original invention, a multi-line ACTS condenser line automatic cleaning system, and access to the national invention patents, system test equipment through on-site practical, economic and energy-saving effect is very obvious, get a lot of customers and promotion. ACTS condenser line automatic cleaning system Introduction 1, the device uses two-cycle design, tee ball circulation loop and closed separately, no mixing of hot and cold water, no drainage receive the ball. 2, Marton ACTS closed loop system tee ball circulation pumps are to contribute, cotton naturally dispersed when serving around the brass can be cleaned, received the ball quickly, ball rate (rate of new machine ball back to 100%). ? 3, Mattoon ACTS system tee and income are not available through the cotton ball circulation pumps and electric solenoid valve, no mechanical wear rubber balls, rubber balls lifetime guarantee. ? 4, Mattoon ACTS system uses a set of balls has a view of the ball as the mirror, the number of rubber balls and rubber balls wear, the water quality is clearly visible window. Plus ball-for-ball very convenient. ? 5, Mattoon ACTS system adopts microcomputer (PLC) control, stable and reliable, to expand good performance. HMI by setting the cleaning frequency and other parameters, and automatically records the number of cleanings and fault indication to help the user understand the operation of equipment. ? 6, Mattoon catching the ball ACTS system uses T-type, Y-type, W-type design, the filter pore area is a pipe cross-sectional area of ??3 to 5 times, catching the ball all the pressure drop are controlled within 0.5 meters. 1000-ton condenser unit installation ACTS Online automatic cleaning system after economic analysis unit 1000-ton project: 1 year 6 months starting time, power 12 hours a day. 2, the coefficient of variation = 0.5 3, electricity 0.8 yuan / kWh 4, manual cleaning fee of 10,000 yuan per year. Manual cleaning downtime three days. 5, ACTS condenser line cleaning equipment power ≤2.2KW, annual replacement rubber ball costs about 1000 yuan / Taiwan. Based on our assessment of the above saving rate does, this project is expected saving rate of 11%. Save electricity = power * years * Running time * saving rate 0.8 yuan RMB / per kilowatt of electricity * difference factor = 633.6KW * 2160hrs * 11% * 0.8RMB / KW * 0.5 = 60217.34RMB cumulative cost savings per year = annual saving of electricity + saving manual cleaning fee = 60217.34 + 10000.00 = 70217.34 RMB NOTE: This is a conservative calculated values, we just press the lowest saving rate of 11%, the highest saving rate we can achieve 44%. ACTS condenser assembly line automatic cleaning device system (1) according to the scene both catch the ball cooling pipe configuration, provide T-(angular type), and Y type (line type) two kinds of specifications of Cleaning the condenser captures the brass balls of rubber foam. 1.1 T type 1.2 Y-type (2) set the ball (3) Pump power unit (4) PLC control box (5) cleaning rubber ball MD ACTS400I ST main component configuration parameters: Equipment Model: MD ACTS400I ST 1, Interface: GB flange DN400, water resistance of 8.1 × 10-2KPa 2, pump: horizontal centrifugal pumps, voltage: 3 × 380-415V 50Hz, power ≤2.2Kw 3, the solenoid valve: Voltage: DC24V 4, flow / pressure switch (optional): WFS10013BA 5, clean the rubber ball: the number of one-way condenser heat transfer tubes 30% -50% process control box 6, PLC: FX1S, AC110-240V 50 / 60Hz 7, Touch screen: MT4414,7 "TFT 65536 colors, 800 * 4808, contacts: LC1E-1210 9, the power adapter: NES100-24 ACTS condenser line cleaning equipment installation process 1, the construction site visits and on-site contact Party, in conjunction with the site Party managed to arrange admission procedures, remember the scene Construction Notes. 2, construction workers, construction materials and tools ready to approach 3 arrangement, cleaning construction workers approach, arrange equipment cleaning, 2 days 4 hours, the installer (plumber 1 people, welder 2, coolie 1) approach began to catch the ball, mounting tee host, pipe connections, etc. 3 days 5 hours, the pipe line. 1 day 6 hours, debugging test one day. 7, installation and commissioning Party invite personnel to the scene after acceptance countersigned, for installation procedures and other tools and equipment personnel leave. ACTS condenser line cleaning equipment operation, installation considerations 1. Design selection is determined according to the condenser inlet and outlet pipe diameter, gum ball size , the type, the proportion of professionals responsible for confirmation by the manufacturer. 2. In the design, installation, and Luke received the ball around the host maintenance space should be left 600mm The host should be installed horizontally, connecting pipes should be smooth vertical and horizontal, to minimize the curve 3. In order to ensure a smooth clean ball clean pipe is not blocked debris, scratches, at least make sure the inlet pipe from the condenser to the condenser outlet pipe tee points to close ball point this pipeline no more than 3mm welding slag, iron, rusty and other debris, the new system, it is recommended in the condenser inlet design mechanical filters, for the transformation of the system to open the front and rear ends of the condenser cover debris cleared away, brushing the heat exchanger pipe wall of dirt, to ensure that every root heat pipe clean as new. 4. Mattoon condenser line automatic cleaning system mainly for cleaning the condenser in good use conditions, Mattoon can fully meet the clean application objects, but for the entire pipeline system except dirt rust-proof, supporting the use of biocide chemical cleaning or other physical treatment methods. 5. Clean the ball replacement depends largely on the frequency of cleaning and water features. In most cases, depending on the wear, clean ball between six months to replace a. In Host deactivate or seasonal shutdown of the situation, to make cleaning ball back to the host. ACTS condenser line cleaning equipment sales maintenance repair and maintenance work management system: 1, after the commissioning of qualified delivery customers in five working days to establish: (1) "customer maintenance record"; (2), " Device Group Practice "; (3) to help customers build water treatment system operation and management system and related ongoing maintenance requirements; 2, regular customer visits or telephone customers to understand the operating conditions of the equipment every two months, found the problem in a timely manner treatment; site inspection once every quarter equipment operating conditions and make inspection records; 3, receiving customer service information, first fill out the "customer warranty" faults can be resolved over the phone, fill resolved after recording the record, as future reference the type of equipment failure; 4, for the fault can not be resolved over the phone, according to the technical service and maintenance personnel staffing the urgency of the overall arrangement, but not more than a predetermined time; 5, reach the customer service field, leading to the phenomenon of the customer unit failure testing, to see if the damaged parts, and do damage to the parts recording; 6, non-damaged parts resulting from failure to do on the spot to solve the need to replace parts of 2 working days to resolve after receiving new parts; 7, every After maintenance units should be filled immediately "maintenance record", after the signing of the views of the archive via the user responsible person, while the "maintenance record" fax to factory customer service center headquarters on file; 8. Every service client group, the replacement parts should fill out "repair parts replacement schedule," signed by the client side and rear heads of offices spread factory customer service center on file; 9, each service is completed, responsible for the maintenance of technical service personnel must fill out the "customer quality information feedback form" and transmitted to the headquarters of the customer service center for the record; 10, all the original form and return after the end of the summary of each customer service center headquarters archives; 11, will replace all worn down piece collection to the customer service center, and return the headquarters of repair parts to offset the recipients within the prescribed time limit. ACTS condenser line cleaning equipment maintenance work content one, maintenance work content water (next to the circulating water flow integrated water processor) Maintenance: 1) Check the status of each work; 2) Check the electric butterfly valve and safety valve operation, 3) Check the electrical control connectors and wire and electrical components connecting wires are tight, replace the damaged elements; whether operational status 4) Check the electrical components normally associated control action is reliable; second, maintenance fees Standard 1) If the repair events that occur in our warranty time and equipment damage by the company's quality problems caused by the product itself, and all costs will be borne by the company. 2) If the repair events that occur within the warranty period of my company, but not because the maintenance of product quality by the company itself and other reasons caused, our company will charge the appropriate cost. 3) If the repair time events that occur beyond the company's warranty period, the cost of consultation. Third, the emergency service schedule: from receipt of the notification required emergency repairs, the company will respond within two hours. Sales Contact: Guo Jingli Mobile: 13538087650, E-mail: 13538087650@139.com Tel: 020-22007682 Fax: 020-22007636 Website: www.marton-acts.com Address: Tianhe District, Guangzhou Huangpu Road West 505 1402 |